Jordan Aggregates EAW

Review Report

  1. April 5th, 2011 County Board Presentation (PDF)
  2. Attachment A - Natural Heritage (PDF)
  3. Attachment B Wetland Information (PDF)
  4. Attachment C Water Monitoring Plan (PDF)
  5. Attachment D Noise Analysis Report (PDF)
  6. Attachment E - Archaeology (PDF)
  7. Cover Letter (PDF)
  8. Figure 1 Project Location (PDF)
  9. Figure 10 Aerial Photograph of Project Site (PDF)
  10. Figure 11 Vicinity Wells (PDF)
  11. Figure 12 Conceptual Geologic Cross Section (PDF)
  12. Figure 13 Geologic Cross Section A-A (PDF)
  13. Figure 14 Geologic Cross Section B-B (PDF)
  14. Figure 15 Haul Route Map (PDF)
  15. Figure 16 Highway 169 Interregional Corridor (PDF)
  16. Figure 17 Highway 169 Interregional Corridor Major Project Priorities (PDF)
  17. Figure 18 2030 Traffic Volumes and Congestion (PDF)
  18. Figure 19 Existing Area Traffic Volume (PDF)
  19. Figure 2 Surrounding Topo (PDF)
  20. Figure 20 Jordan 2030 Transportation Plan (PDF)
  21. Figure 3 Surrounding Land Use (PDF)
  22. Figure 4 Vicinity Map (PDF)
  23. Figure 5 Bedrock Geology and Ground water Susceptibility (PDF)
  24. Figure 6 Soil Classification (PDF)
  25. Figure 7 Minnesota Land Cover Classification System (PDF)
  26. Figure 8 Existing Natural Resources (PDF)
  27. Figure 9 Aerial Photograph of Project Site and Surrounding Area (PDF)
  28. Figure 9 Aerial Photograph of Project Site and Surrounding Area cont (PDF)
  29. Groundwater Model July 2010 (not used in EAW) (PDF)
  30. Jordan Aggregates EAW (PDF)
  31. March 31st, 2011 - Ground Water Model (PDF)
  32. Responses to Comments and Finding of Facts and Conclusion (PDF)
  33. Sheet 1 Existing Conditions (PDF)
  34. Sheet 2 Mining Plan (PDF)
  35. Sheet 3 Processing Plant Layout (PDF)
  36. Sheet 4 Reclamation Plan (PDF)
  37. Sheet 5 Reclamation with Wetland Plan (PDF)